SB Labs worked closely with BAM Construction and Broadway Malyan Architects, along with end-user representatives to provide the highest product and finish specification and also satisfy specific end-user requirements. Part of the product evaluation process included Architect and end user representatives visiting SB Labs’s completed CTL Building at the University of Birmingham, which formed part of the reason SB Labs secured the project.
SB Labs provided Exemplaire C frame system with a mix of mobile and fixed under bench cabinets, worktops were Trespa TopLab Plus and the bench mounted overhead service delivery systems were designed to provide a high level of power which was specific to the end users requirements.
To find out more about these furniture systems download the Pdf brochure from the Exemplaire C Framepage or visit our Case Studies page to discover other completed projects.
